The only operating and maintenance costs are caused by the emptying of sludge that is carried out once a year, as well as the blower that consumes approx. 4€/month of electricity.
Blog
You will always achieve an excellent treatment result with the Bioreactor
The Bioreactor has been independently tested for six years. The Bioreactor meets the strictest requirement level of the wastewater legislation 19/2017 in all conditions. You will always achieve an excellent treatment result with the Bioreactor despite the equipment level of your property, temporary use and relevant season – the environment will thank you.
Flawless design and simple installation
The Bioreactor has been carefully designed to meet the requirements of its intended use. Installation is extremely easy, you cannot fail! You do not need to consider the soil quality, plot size, sufficiency of height differences, pump stations, etc.
The Bioreactor only requires an area of 1.5 x 1.5 metres. The height difference between the inlet and outlet sewer is only 5 cm.